Written by 5:21 am

UPC Code Quiz | Third Quarter 2026

Roof areas of 10,000 square feet or less shall have no less than (controlled flow roof drainage) _______.

Storm drain systems shall be tested upon completion of the rough piping by using ____.

Schedule 40 plastic DWV storm drain systems shall not be tested by ______.

Calculations for the controlled flow roof drainage system shall be submitted along with plans to the ___________.

Last modified: July 14, 2026

Close