Where pneumatic testing is conducted, a process piping system shall be tested at not less than _____.

The test pressure for a process piping system shall be held for a length of time acceptable to the Authority Having Jurisdiction but in no case for less than ____________.

All liquid Hazardous Process Piping waste or drainage shall be installed in accordance with the ____________________.

In addition to other requirements of the Mechanical Code, hazardous process piping gases shall also comply with _____________.